Project Overview

Proposed to mitigate and reduce flood impact at Jalan Teknorat, Mukim Dengkil as a mean to improve main drainage system by increasing the hydraulic capacity at main drainage outlet. The works included an upgrade of existing drainage

Project Details

Completion Date TBA
Location Sepang, Cyberjaya
Surface Area nil
Client Setia Haruman Sdn. Bhd.
Remarks RM806,900.00

Scope of work

**Upgrading the existing rivers and drainage system, construction of retention ponds, installation of drainage pumping system, construction of outlet channels and river gates